BCRA BRITISH CAVE RESEARCH ASSOCIATION  Home
 Contact Us  BCA  Search   
Show/Hide Site Index     Enlarge/Reduce Font Sizes  
About BCRA
Subscription Fees
Contact Us
Summary Info
Constitution
History
Copyright etc.
Publications
Publications Info
Newsletter/Forum/eList
Speleology
Cave & Karst Science
Cave Studies
CREG Journal
Special Interest Groups
SIGs Info
Biological Recorder
Explosives Users
Cave Radio & Electronics
Cave Surveying
BCRA Surveying Grades
Grants, Prizes, Awards
Grant-aid Info
Research Fund (CSTRI)
Ghar Parau Foundation (GPF)
Cave Conservation (UKCCEF)
National Awards
BCRA Photo Salon
Events & Meetings
Events Info
Science Symposium
Tech. Symposium
Regional Meetings
Annual Conference
Library
British Caving Library
Journal Exchanges
Cave Science Index
Insurance
Travel
Public Liability

BCRA > Special Interest Groups > BCRA Survey Grades

logo

An introduction to Cave Surveying - New Edition
 

A new edition of this booklet in the Cave Studies series was published in July 2002. The booklet include information on prices of instruments, surveying software, useful web sites and so on. From time to time, updates to that information will be available as a free insert, and will also be published on this web page.

For more information about cave surveying visit the home page of BCRA's Cave Surveying Group

 

BCRA Survey Grades
 

As revised for inclusion in the new edition of Cave Surveying, July 2002

Table 1: BCRA gradings for a cave line survey

Grade 1
Sketch of low accuracy where no measurements have been made
Grade 2 (use only if necessary, see note 7)
May be used, if necessary, to describe a sketch that is intermediate in accuracy between Grade 1 & 3
Grade 3
A rough magnetic survey. Horizontal & vertical angles measured to ±2.5º; distances measured to ±50 cm; station position error less than 50cm.
Grade 4 (use only if necessary, see note 7)
May be used, if necessary, to describe a survey that fails to attain all the requirements of Grade 5 but is more accurate than a Grade 3 survey.
Grade 5
A Magnetic survey. Horizontal and vertical angles measured to ±1º; distances should be observed and recorded to the nearest centimetre and station positions identified to less than 10cm.
Grade 6
A magnetic survey that is more accurate than grade 5, (see note 5).
Grade X
A survey that is based primarily on the use of a theodolite or total station instead of a compass, (see notes 6 and 10 below).

Notes

  1. The above table is a summary and is intended only as an aide memoire; the definitions of the survey grades given above must be read in conjunction with these notes.
  2. In all cases it is necessary to follow the spirit of the definition and not just the letter.
  3. To attain Grade 3 it is necessary to use a clinometer in passages having appreciable slope.
  4. To attain Grade 5 it is essential for instruments to be properly calibrated, and all measurements must be taken from a point within a 10cm diameter sphere centred on the survey station.
  5. A Grade 6 survey requires the compass to be used at the limit of possible accuracy, i.e. accurate to ±0.5º; clinometer readings must be to the same accuracy. Station position error must be less than ±2.5 cm, which will require the use of tripods at all stations or other fixed station markers ('roofhooks').
  6. A Grade X survey must include on the drawing notes descriptions of the instruments and techniques used, together with an estimate of the probable accuracy of the survey compared with Grade 3, 5 or 6 surveys.
  7. Grades 2 and 4 are for use only when, at some stage of the survey, physical conditions have prevented the survey from attaining all the requirements for the next higher grade and it is not practical to re-survey.
  8. Caving organisations etc, are encouraged to reproduce Table 1 and Table 2 in their own publications; permission is not required from BCRA to do so, but the tables must not be reprinted without these notes.
  9. Grade X is only potentially more accurate than Grade 6. It should never be forgotten that the theodolite/Total Station is a complex precision instrument that requires considerable training and regular practice if serious errors are not to be made through its use!
  10. In drawing up, the survey co-ordinates must be calculated and not hand-drawn with scale rule and protractor to obtain Grade 5.

Table 2. BCRA gradings for recording cave passage detail

Class A
All passage details based on memory.
Class B
Passage details estimated and recorded in the cave.
Class C
Measurements of detail made at survey stations only.
Class D
Measurements of detail made at survey stations and wherever else needed to show significant changes in passage dimensions.

Notes

  1. The accuracy of the detail should be similar to the accuracy of the line.
  2. Normally only one of the following combinations of survey grades hould be used:
    1A,
    3B or 3C,
    5C or 5D,
    6D,
    XA, XB, XC or XD.
 


British Cave Research Association (UK registered charity 267828). Registered Office: The Old Methodist Chapel, Great Hucklow, BUXTON, SK17 8RG
Top of Page - 0 | Home Page - 1 | Summary Information - 2 | Publications - 3 | Contact Us - 4 | Search Site - 5 | Accessibility, Copyright & Policy Info - 7

This page, http://www.bcra.org.uk/surveying/index.html was last modified on Sun, 10 Nov 2002 23:00:00 +0000